Drilling rig move set between July 19 & 24
The drilling rig required to remediate a well leaking methane [...]
The drilling rig required to remediate a well leaking methane [...]
The location, available for view on the AER's Abandoned Well [...]
Lakeland Connect | 5027 50th Avenue | PO Box 5592 | Bonnyville, AB | T9N 2G6 | 587.840.4409 | connect@lakelandconnect.net